Kilimanjaro Expedition
Itinerary & Route Details

Quick Links

Route profile comparison

 

The Machame Route-7 Days...our most popular route

Day 1 & 2
Depart Home cities on Day 1, arrive Amsterdam morning of Day 2, arrive JRO evening Day 2, overnight at Outpost Lodge.

Day 3
Rest day, shopping, gear check. Overnight at Outpost Lodge.

Day 4 Machame Gate to Machame Camp
Hike time: 7.5 hrs
Elevation change: +1200m
Estimated distance: 10km
Camp elevation: 3100m

Early pick-up at Outpost Lodge and a 40-minute drive to Machame gate (5,400’) where trekking formalities take about 30 minutes.  From the gate, we begin our trek following an easy track for the first hour through the dense forest. The path continues to follow the ridge, rising steadily with several steep sections. The gradient eases slightly as the forest merges into heather covered ground we will reach Machame Hut in 10 km (6.2 miles) after a 1,200-meter ascent.

Day 5 Machame Camp to Shira Camp

Hike time: 7 hrs
Elevation change: +800m
Estimated distance: 6km
Camp elevation: 3800m

From the Machame Hut we cross the stream onto its west bank and follow the path up the steep rocky ridge crises-crossing a few times before reaching Shira Hut at the base of a semi-circular wall of rocks. We will have ascended 900 meters in 5-7 hours and about 6 km (3.72 miles) of walking.

Day 6 Shira Camp to Barranco Camp
Hike time: 5 hrs
Elevation change: +100m
Estimated distance: 5km
Camp elevation: 3900m

From Shira Hut hike to Lava Tower and then proceed to Barranco via the Great Barranco Wall. This route offers panoramic views of Kibo through Karanga Valley as we hike high and sleep low, dropping back down to Barranco after lunch.

Day 7 Barranco Camp to Karanga Valley
Hike time: 3.5 hrs
Elevation change: +100m
Estimated distance: 4km
Maximum elevation: 4590m
Camp elevation: 4000m

From Barranco Camp we climb up through the edge of great the Great Barranco Wall. The majority of the day walking will fluctuate around the elevation of 4250m.

Day 8 Karanga Valley to above Barafu Hut (Kosovo Camp)
Hike time: 3.5 hrs
Elevation change: +600m
Estimated distance: 4km
Final elevation: 4600m

Today involves gaining more elevation, acclimatizing and resting for the summit attempt the next morning. We will camp at an isolated spot above all of the masses at Barafu. This will put us an hour closer to the summit! This day will take us 4 to 6 hrs of walking.

Day 9 High Camp to the Summit and then Millineum Camp
SUMMIT DAY!
Estimated summit time: 7 hrs
Elevation change: +1300m
Estimated distance: 5km
Final elevation: 5895m
Descent time: 5 hrs
Elevation change: -2800m
Estimated distance: 12km
Camp elevation: 3100m

We will start trekking early before sunrise (1-2 am) as the walk today will take 10-14 + hours. We will avoid the mist that sets in later in the day; the scree and snow will still be safely frozen. The 1,100-meter (3,600’) ascent in just over 3 km (1.86 miles) will take us about 6-8 hours. After a brief stay at the summit of the highest point in Africa, Uhuru Peak, at over 5,898 meters (19,340'), we descend via the Barafu Route roughly 2,500 meters (8,200’) in 12 km (7.44 miles) in about 4-7 hours to Millennium Camp.

Day 10 Millennium Camp to Mweka Gate

Descent time: 4 hrs
Elevation change: -1250m
Estimated distance: 10km
Final elevation: 1828m

Today we descend about 1400 meters (4,592’) through the forest on a jungle path for about 10 km (6.2 miles) in 3-4 hours to reach Mweka Gate. Our representative will transfer you to the Outpost Lodge.

Day 11
Relax, eat and shop. If not doing Safari you will depart for home around 9pm.

 

Safari Option

Day 11
Depart Arusha in a.m. (from Outpost Lodge) for Kilimanjaro airport and flight to
Serengeti. An afternoon game drive with overnight and dinner at Serengeti lodge.

Day 12
Early morning game drive in Serengeti. Depart for long dusty ride (4-5 hours) to Ngorongoro Crater, lunch in route. Overnight and dinner at lodge.

Day 13
Early morning game drive in Crater. Late morning breakfast, depart for Lake Manyara. Overnight and dinner at Lake Manyara Lodge.

Day 14
Late morning departure from Lake Manyara to Arusha arriving early afternoon at
IOutpost Lode for day room use...shower and packing. Flight home usually departs at 9pm.

Door to Door Day Total with Travel

Climb only - 12 days
Climb and Safari - 16 days
Climb, Safari and 3 days of Zanzibar - 18 day


Click for full size map of
Kilimanjaro Climbing Routes

UPCOMING KILIMANJARO EXPEDITIONS
March 5 - March 16, 2010
March 19 - March 30, 2010
April 16 - April 27, 2010
May 30 - June 10, 2010
June 18 - June 29, 2010
July 23 - August 3, 2010
JE August 14 - August 25, 2010
*only 2 spots remaining
August 27 - September 7, 2010
September 24 - October 5, 2010
October 15 - October 26, 2010
November 17 - November 28, 2010
JE November 29 - December 10, 2010
Private Expedition
*3 open spots available
December 18 - December 29, 2010

JE = Guided by Jeff Evans (2010 will be the last Grand Expedition until 2013)
*Private trip date options available at no extra cost. Ask us
*Dates listed are departure from and return home.


 aFRICA PHOTO GALLERY

MOUNTAINVISION APPLICATION

Click here or on the icon to download application. Print and fill out all appropriate sections. Contact us with any questions regarding the application process.
 

Download Application

Send applications and deposits to:
MountainVision Expeditions
1024 55th St.
Boulder, CO 80303


MOUNTAINVISION PRODUCTS
MV Book

MountainVision: Lessons Beyond the Summit

Order Book

All MountainVision Products